Analysis on the installation and operation specifications of titanium reactor

Aug 07, 2023

1. The titanium reactor should be placed indoors. When equipping multiple devices, they should be placed separately. Each operating room should have an outlet directly leading to the outside or passage, and the equipment location should be well ventilated.
2. When installing the lid of the kettle, the sealing surfaces of the kettle body and the lids should be avoided from colliding with each other. Carefully place the lid of the kettle on the kettle body at a fixed position. When tightening the main nut, it should be tightened diagonally and symmetrically for several times. The force should be uniform, and the lid of the kettle is not allowed to tilt to one side, so as to meet the good sealing effect.
3. At the joint of positive and negative nuts, only the positive and negative nuts are allowed to be rotated, and the two circular arc sealing surfaces must not be rotated relative to each other. When the nut pattern joints are assembled, lubricating oil should be applied.
4. The needle-type valve is sealed with a thread, as long as the valve needle is rotated slightly and the cover is pressed tightly, a good sealing effect can be obtained.
5. Turn the rotating body on the titanium reactor by hand to check whether the operation is flexible.
6. The controller should be placed flat on the operating table. The working environment temperature is 10-40°C, the relative humidity is less than 85%, and there is no conductive dust or corrosive gas in the surrounding medium.
7. Check whether the movable parts and fixed contacts on the front panel and rear panel are normal, pull off the upper cover, and check whether the contact of the connector is loose, and whether there is any damage or corrosion caused by improper transportation and storage.
8. The controller should be firmly grounded.
9. Connect the wires, including power wires, electric furnace wires between the controller and the kettle, motor wires, temperature sensor and speedometer wires.
10. Turn on the main air switch of "power supply" on the panel, and the digital display should display.
11. Set various parameters (such as upper limit alarm temperature, working temperature, etc.) on the digital display meter, then press the "heating" switch, the electric furnace is turned on, and the indicator light on the "heating" switch is on. Adjust the "pressure adjustment" knob to adjust the heating power of the electric furnace.
12. Press the "stirring" switch, the stirring motor is energized, and at the same time the indicator light on the "stirring" switch is on, slowly turn the "speed adjustment" knob to make the motor rotate slowly, and observe whether the motor is rotating forward. If there is no error, stop and hang up belt, and restart.
13. After the operation is over, it can be cooled naturally, cooled by water or placed on a stand for air cooling. After the temperature drops, release the pressurized gas in the titanium reactor to reduce the pressure to normal pressure, then unscrew the main nut symmetrically, then remove the main nut, then carefully remove the lid of the kettle and place it on the bracket.
14. After each operation, the residue on the kettle body and lid should be cleaned. The main sealing port should be cleaned frequently and kept clean, and it is not allowed to wipe with hard objects or rough surfaces.